Permit Types



Single Block Festivals

When hosting a single block festival, keep in mind the following:

  • Applications must be submitted 90 days before the event.
  • There may be additional fees for hosting a single block festival outside of the $25 application fee
  • Single block festivals are limited to one block and 12 consecutive hours
  • Rain dates are not permitted
  • Your organization must be a nonprofit with an EIN and proof of nonprofit status. This documentation must be submitted with the application
  • Your organization must be insured for a minimum of $1 million.  Additional insurance may also be required
  • You may require additional permits. All other agency permits must be obtained before we can grant your SAPO permit. Examples include:

Apply for a Single Block Festival Permit

 

Permit Types