Boiler Forms


Online Boiler Appointment Request Form:

  • The Boiler Appointment Request Form is no longer in use. To request a boiler appointment, please visit DOB NOW Inspections.

BO9 DOB Boiler Inspection Report

Beginning August 14, 2017, form BO9 must be filed in DOB NOW: Safety.

For additional information on filings details and deadlines, visit DOB NOW: Safety.

Download Form - ONLY available through December 31, 2017 for 2016 late submissions.

Download Instructions - ONLY available through December 31, 2017 for 2016 late submissions.


Annual Boiler Inspection Review List

This resource lists the inspection requirements for performing an annual boiler inspection.


BO13 Boiler Inspection Defect Report and Affirmation of Correction

Service Update: Beginning August 14, 2017, BO13 form can no longer be submitted for the 2017 inspection year*.  Licensed professionals must file in DOB NOW: Safety.

Visit www.nyc.gov/dobnowinfo for further details on how to file boiler inspection reports in DOB NOW: Safety.

*The BO13 form may still be submitted for the 2016 inspection cycle until December 31, 2017, provided that:

  • the boiler defects were found during an annual inspection performed by a licensed professional in 2016 (the BO9 form must already be filed and a copy must be attached); and
  • the Department receives the BO13 form no later than 12 months after the date when the BO9 inspection took place.  Late filing civil penalties will apply

Download Form - ONLY available through December 31, 2017 for 2016 late submissions.

Download Instructions - ONLY available through December 31, 2017 for 2016 late submissions.


BO-13E Affirmation of Correction Extension Request

This form is no longer available. The last day of submission was June 30, 2017 for the 2016 annual boiler inspection cycle.

To file a Subsequent Inspection Report (Affirmation of Correction Extension Request) for the 2017 annual boiler inspection cycle, please login to DOB NOW: Safety.


OP49: Self-Certification for Removal of Existing Boiler

Effective September 3rd. 2019, OP49 forms will be filed in DOB NOW Build.

Required for removal or disconnection of an existing boiler.


BBI1  Boiler Batch Intake Form

Boiler applicants can use this form to file five (5) or more inspection reports for OP49 and BWP submissions. All 2017 annual boiler inspection filings must be submitted in DOB NOW: Safety.

Download Form - Rev. 9/11


BWP Boiler Waiver of Civil Penalties Form

Use this form to request a waiver of boiler civil penalties.

Download Form - Rev. 1/11

Download Instructions