Skilled Trades Checklists: Curb Cuts

Project Checklists contain project-specific details as they apply to the scope of work of the project to provide compliance with the NYC Construction Codes and other regulations. This section contains a list of tasks to assist with compliance.

Checklists include:

Pre-Permit Checklist

  • Construction Drawings. Make sure Department-approved drawings clearly convey the project scope and the contracted work reflects the approved and full scope of work.

    If the scope is modified after approval, verify if changes need an amendment – refer to AC Section 28-104.
  • Insurance Requirements. Make sure to comply with the insurance requirements for general liability insurance, workers compensation and disability insurance. If necessary, update the general liability insurance when required.

Get a printable version.

On-going Project Work Checklist

  • Construction Drawings. Make sure work conforms to approved drawings. However, minor variations are allowed – see minor variations memo. Certain changes may require an amendment.
  • Scope Modification. Verify if changes need an amendment.
  • Site Safety. The Contractor must maintain their work site in a safe condition during construction and must minimize the risk of accidents and fire.
  • Department Inspections. Make sure to request or self-certify the required inspections, by stage of completion, and obtain sign-off for the completed work.
  • Self-Certification.  If self-certifying the required inspections, make sure to submit a Notice of Intent to Self-certify, which may be audited.

Get a printable version.

Project Completion Close-out Checklist

  • Department Inspections. Make sure to request or self-certify the required inspections, by stage of completion, and obtain sign-off for the completed work.
  • Self-Certification.  If self-certifying the required inspections, make sure to submit a Notice of Intent to Self-certify, which may be audited.
  • As-Built Submission.  Coordinate installation with the Registered Design Professional (RDP) for submission. RDP to submit PAA as required.
  • Final Sign-off.  Make sure to complete all Department inspections and obtain final sign-off of the completed work.

Get a printable version.

Skilled Trades Links

Helpful Links