Weekend Traffic Advisory

Friday May 3, 2024, to Sunday May 5, 2024

This traffic alert details the locations of road construction and other events that will affect the flow of traffic this weekend. This information is subject to change. Check the Weekly Traffic Advisory Check the Special Traffic Advisory

Other state and local agencies are responsible for street construction work in New York City. Visit the Department of Design and Construction, the New York State Department of Transportation, the Port Authority of New York and New Jersey and MTA for more construction and traffic information. Check who operates bridges and tunnels

The times listed for closures for street fairs are for the actual times of the street fairs themselves. The streets may be closed for longer to allow for set-up and breakdown. Street fair organizers are generally permitted to begin set-up at 8 am and breakdown must be completed by 7 pm.

Manhattan

East 7 Street between Avenue A and 1st Avenue

This street will be closed from 9 am to 3 pm Monday to Friday through 5/10/24 to place boom lift on side for facade inspection.

West 10 Street between Bleecker Street and West 4 Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/26/24 to excavate and install conduit for system reinforcement.

East 15th Street between Union Square West and 5th Avenue

This street will be closed from 5 am to 9 am Saturday and/or Sunday through 5/11/24 for building inspection from boom truck.

East 16th Street between 5th Avenue and Union Square West

This street will be closed from 5 am to 9 am Saturday and/or Sunday through 5/11/24 for building inspection from boom truck.

West 16 Street between 9th Avenue and 10th Avenue

This street will be closed from 5 am to 3 pm Saturday and Sunday through 5/5/24 to facilitate crane operation.

East 17th Street between Park Avenue South and Irving Place

This street will be closed from 4 am Saturday to 10 pm Sunday through 5/5/24 to facilitate crane operation.

East 26th Street between Park Avenue South and Lexington Avenue

This street will be closed from 7 am to 1 pm Saturday and Sunday through 5/12/24 for building inspection from boom truck.

West 27th Street between 12th Avenue and 11th Avenue

This street will be closed from 9 am to 3 pm Monday to Friday through 5/9/24 to facilitate crane operation.

West 31 Street between Broadway and 5th Avenue

This street will be closed from 5 am to 9 am Saturday and Sunday through 5/11/24 to facilitate crane operation.

West Street 38th Street between 9th Avenue and 10th Avenue

This street will be closed This street will be closed from 6 am to 2 pm Saturday and Sunday through 5/26/24 to facilitate crane operation.

East 47th Street between Vanderbilt Avenue and Madison Avenue

This street will be closed 24/7 through 11/14/24 for Grand Central Terminal train shed project.

East 47th Street between Park Avenue and Vanderbilt Avenue

This street will be closed 24/7 through 11/14/24 for Grand Central Terminal train shed project.

East 48th Street between Madison Avenue and Park Avenue

This street will be closed 24/7 through 11/14/24 for Grand Central Terminal train shed project.

East 50th Street between 2nd Avenue and 1st Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/11/24 to repair sewer.

West 52nd Street between 8th Avenue and Broadway

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

West 54th Street between 9th Avenue and 8th Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/12/24 to facilitate crane operation.

West 56 Street between 6th Avenue and 5th Avenue

This street will be closed from 10 pm to 6 am nightly through 5/15/24 to facilitate crane operation.

West 64th Street between West End Avenue and Amsterdam Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 for gas main/service installation.

East 67th Street between 1st Avenue and 2nd Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 for building inspection from boom truck.

East 69th Street between Madison Avenue and Park Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/13/24 for steam pad concrete curing.

West 69th Street Broadway and Columbus Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

West 69th Street between Columbus Avenue and Central Park West

This street will be closed from 9 am to 3 pm Monday to Friday through 5/3/24 for use knuckle boom to deliver mechanical equipment.

East 70th Street between Lexington Avenue and 3rd Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/12/24 for major gas installation.

West 73rd Street between Columbus Avenue and Amsterdam Avenue

This street will be This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/10/24 for building inspection from boom truck.

East 74th Street between 1st Avenue and York Avenue

This street will be closed from 4 am to 10 pm Saturday and Sunday through 5/5/24 to main and assist mobile cranes to dismantle tower crane.

East 74th Street between York Avenue and Dead End

This street will be closed from 4 am to 10 pm Saturday and Sunday through 5/5/24 to dismantle tower crane.

West 74th Street between Columbus Avenue and Central Park West

This street will be This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

East 77th Street between 2nd Avenue and 1st Avenue

This street will be closed from 9 am to 4 pm Friday through 5/17/24 for facade inspection and restoration.

East 77th Street between 2nd Avenue and 3rd Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/2/24 to repair sewer.

East 77th Street between 2nd Avenue and 3rd Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/4/24 for sewer repair.

East 83rd Street between 5th Avenue and Madison Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday to facilitate crane operation.

East 88th Street between 5th Avenue and Madison Avenue

This street will be closed be This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/26/24 to repair sewer.

West 89 Street between Amsterdam Avenue and Columbus Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/18/24 to load materials or pump concrete to the upper floors and roofs.

East 91st Street between 1st Avenue and York Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 7/9/24 to facilitate crane operation.

West 94th Street between Amsterdam Avenue and Columbus Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/30/24 for major gas installation.

West 95th Street between West End Avenue and Pomander Walk (Broadway)

This street will be closed from 9 am to 4 pm Friday through 5/31/24 to facilitate crane operation.

West 112th Street between Broadway and Riverside Drive

This street will be closed This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/1/24 to pour concrete onto new roof deck to stabilize and reinforce existing 6 story building for Columbia University.

West 140th Street between Amsterdam Avenue and Hamilton Place

This street will be closed from 9 am to 5 pm Monday to Friday through 5/7/24 to facilitate crane operation.

West 162nd Street between Saint Nicholas Avenue and Broadway

This street will be closed from 9 am to 4 pm Monday to Friday through 5/7/24 to facilitate crane operation.

West 212th Street between Broadway and 10th Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

Union Square West between East 17th Street and East 16th Street

This street will be closed 5 am to 9 am Saturday and/or Sunday through 5/11/24 for building inspection from boom truck.

Vesey Street between Church Street and Broadway

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/26/24 for test pits & exploratory utility work.

Pine Street between Nassau Street and Broadway

This street will be closed from 7 am to 4 pm Monday to Friday, 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/15/24 for reconstruction of Nassau Street.

Clinton Street between Rivington Street and Stanton Street

This street will be closed from 9 am to 4 pm Friday through 5/13/24 for concrete operations.

Baruch Drive between Delancey Street South and Delancey Street North

This street will be closed from 7 am to 4 pm Monday to Friday through 5/3/24 for east side coast resiliency.

Spruce Street between Nassau Street and Park Row

This street will be closed from 7 pm to 6 am weeknights through 5/3/24 for roadway marking.

Spruce Street between William Street and Gold Street

This street will be closed from 7 pm to 6 am weeknights through 5/3/24 for roadway marking.

Beekman Street between William Street and Gold Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

King Street between Hudson Street and Greenwich Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

Charlton Street between Hudson Street and Varick Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

Wooster Street between Broome Street and Spring Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/12/24 to facilitate crane operation.

Spring Street between Hudson Street and Varick Street

This street will be from 7 am to 4 pm Monday to Friday through 5/13/24 for roadway closure in order to run a camera through the combined sewer on Spring Street.

Mercer Street between Spring Street and Prince Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/12/24 to facilitate crane operation.

Crosby Street between Prince Street and Jersey Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/5/24 to facilitate crane operation.

King Street between Hudson Street and Greenwich Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/4/24 for concrete pour.

Nassau Street between Spruce Street and Beekman Street

This street will be closed from 7 pm to 6 am weeknights through 5/3/24 for roadway marking.

York Avenue between East 74th Street and East 73rd Street

This street will be closed from 4 am to 10 pm Saturday and Sunday through 5/5/24 for tower crane boom landing and disassembly.

York Avenue between East 75th Street and East 74th Street

This street will be closed from 4 am to 10 pm Saturday and Sunday through 5/5/24 for tower crane boom landing and disassembly.

Battery Park Underpass (BPU) between Route 9A/West Street and FDR Drive

One tube at a time in either direction will be closed intermittently, Monday to Friday from 11 pm to 5 am next morning, through June 28, 2024, to facilitate inspection, maintenance, and repairs. Also, both northbound and southbound tubes will be intermittently closed Monday to Friday from 11 pm to 5 am through May 31, 2024, to facilitate hydrostatic testing.

MacDougal Street between Minetta Lane and West 3rd Street

This street will be closed from 7 am to 3 pm Monday to Friday through 6/7/24 for major gas installation.

MacDougal Street between MacDougal Alley and West 8th Street

This street will be closed from 7 am to 4 pm Friday through 5/10/24 for concrete operations for foundation and super structure.

MacDougal Street between Bleecker Street and Minetta Lane

This street will be closed from 7 am to 3 pm Monday to Friday through 6/7/24 for major gas installation.

MacDougal Street between Washington Square North and MacDougal Alley

This street will be closed from 7 am to 4 pm Friday through 5/10/24 for concrete operations for foundation and super structure.

Thompson Street between West 3rd Street and Bleecker Street

This street will be closed from 9 am to 4 pm Friday through 5/8/24 for booming operations.

Ann Street between Park Row and Theater Alley

This street will be closed from 9 am to 4 pm Friday through 5/13/24 for pump concrete and to hoist materials.

Gouverneur Slip East between Water Street and South Street

This street will be closed from 7 am to 4 pm Friday, and 8 am to 4 pm Saturday through 5/6/24 for East side coast resiliency.

Greene Street between West 4th Street and Washington Place

This street will be closed from 7 am to 7 pm Saturday and Sunday through 5/19/24 for associated closure during assembly/disassembly.

Greene Street between Washington Place and Waverly Place

This street will be closed from 7 am to 7 pm Saturday and Sunday through 5/19/24 for associated closure during assembly/disassembly.

Jackson Street between Water Street and South Street

This street will be closed from 9 am to 4 pm Friday through 6/3/24 for east side coast resiliency.

Bethune Street between West Street and Washington Street

This street will be closed from 9 am to 4 pm Friday through 6/24/24 for major gas installation.

Jane Street between West Street and Washington Street

This street will be closed from 9 am to 4 pm Monday to Friday through 5/6/24 to facilitate crane operation.

Bank Street between Washington Street and Greenwich Street

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/12/24 to facilitate crane operation.

Washington Place between Greene Street and Mercer Street

This street will be closed from 7 am to 7 pm Saturday and Sunday through 5/19/24 to facilitate crane operation.

Washington Place between Greene Street and Washington Square East

This street will be closed from 7 am to 7 pm Saturday and Sunday through 5/19/24 to facilitate crane operation.

Washington Square East between Washington Place and Washington Square South

This street will be closed from 7 am to 4 pm Friday through 5/25/24 for special operations to include knuckle boom equipment.

Washington Square North between MacDougal Street and 5th Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/12/24 to facilitate crane operation.

Washington Square North between 5th Avenue and University Place

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/12/24 for associated closure.

Riverside Drive (Northbound Service Road) between West 152nd Street and West 153rd Street

This street will be closed 24/7 through 5/6/24 for safety reasons-NYCDOT contract HBM1165 rehab.

Harlem River Ramp (Northbound Entrance East 126th Street) between 2nd Avenue Southbound and 2nd Avenue Northbound

This street will be closed from 7 am to 6 pm Monday to Sunday through 5/10/24 for installation of new 13Kv feeders across Harlem River.

FDR Drive Southbound between Jackson Street and Cherry Street

Single-lane will be closed Friday from 11 pm to 7 am next morning, and Sunday from 11 pm to 10 am next morning. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate East Side Coastal Resiliency Project and will continue through September 11, 2026.

FDR Drive between Montgomery Street and East 15 Street

Single-lane northbound and/or southbound will be closed Monday to Thursday from 10 pm to 5 am next morning, Saturday from 12:01 am to 9 am, and Sunday from 1 am to 11 am. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 1 am to 7 am. These closures are necessary to facilitate median reconstruction and will continue through August 15, 2026.

FDR Drive between East 73 Street and East 71 Street

Single-lane northbound will be closed Monday to Thursday from 10 pm to 5:30 am next morning, Friday from 11 pm to 10 am next morning, and Saturday from 11 pm to 11 am next morning. Double-lane northbound will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 2 am to 6 am, and Sunday from 2 am to 7 am. Southbound FDR Drive service road between East 73 and East 71 Streets, FDR Exit Ramp (Exit 13), and Entrance Ramp to southbound FDR Drive will be closed Monday to Friday from 9:30 pm to 5 am next morning, Friday from 11 pm to 10 am next morning, and Saturday from 11 pm to 11 am next morning. These closures will continue through April 30, 2024, and are necessary to facilitate construction of Kellen Tower over the FDR Drive.

FDR Drive Southbound Exit 13 at East 73 Street

Southbound exit ramp at East 73 Street (Exit 13) will be closed Monday to Thursday from 11 pm to 5 am next morning, Friday from 11 pm to 10 am next morning, and Saturday from 11 pm to 11 am next morning, through May 17, 2024, to facilitate re-installing cathodic protection on the live oil line.

FDR Drive Southbound Entrance Ramp between East Houston Street and Delancey Street

Entrance ramp to southbound FDR will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 2 am to 6 am, and Sunday from 2 am to 7 am, through June 30, 2024, to facilitate access to the manhole/underground facilities.

FDR Drive Southbound at 74 Street

Single-lane will be closed Monday to Thursday from 11 pm to 5:30 am next morning, Friday from 11 pm to 6:30 am next morning, and Sunday from 12 am to 11 am, through June 30, 2024, to facilitate facade repairs.

FDR Drive Southbound between East 112 Street and East 12 Street

Single-lane will be closed Monday to Thursday from 11 pm to 5:30 am next morning, Saturday from 12:01 am to 6:30 am, and Sunday from 1 am to 11 am. Double-lane will be closed Tuesday to Friday from 1 am to 5 am, Saturday from 2 am to 6 am, and Sunday from 2 am to 7 am. These closures are necessary to facilitate repairs to the underground facilities and will continue through May 31, 2024.

First Avenue Underpass between 40 Street and 49 Street

One tube at a time in either direction will be closed, Monday to Friday from 11 pm to 5 am next morning, through May 31, 2024, to facilitate inspection, maintenance, and repairs.

Northbound Route 9A/West Street between Chambers Street and North Moore Street

Single-lane will be closed Saturday from 9 am to 6 pm through May 11, 2024, to facilitate equipment delivery and installation.

Northbound Route 9A/West Street between Warren Street and Hubert Street

Single-lane will be closed Monday to Friday from 10 pm to 5 am next morning, and Saturday and Sunday from 9 am to 6 pm. Double-lane will be closed Monday to Friday from 10 pm to 5 am next morning, Saturday from 1 am to 8 am, and Sunday from 2 am to 10 am. Triple-lane will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 2 am to 8 am. These closures are necessary to facilitate Coastal Resiliency Project and will continue through July 1, 2024.

Southbound Route 9A/West Street between Hubert Street and Warren Street

Single-lane will be closed Monday to Friday from 9 pm to 5 am next morning, and Saturday and Sunday from 9 am to 6 pm. Double-lane will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 9 am, and Sunday from 2 am to 10 am. These closures are necessary to facilitate Coastal Resiliency Project and will continue through July 1, 2024.


Festivals, Parades and Events


NYC Cannabis Parade

The following streets will be closed for the NYC Cannabis Parade on Saturday, May 4th, 2024 at the discretion of the NYPD in Manhattan.

Location(s):
Formation:
  • Broadway between West 33rd Street and 32nd Street
Route:
  • Broadway between West 33rd Street and West 26th Street
  • West 26th Street between Broadway and 5th Avenue
  • Broadway between West 26th Street and East 18th Street
  • East 18th Street between Broadway and Park Avenue South
  • Park Avenue South between East 18th Street and East 17th Street (Southbound Lane on Park Avenue South Only)
  • Union Square East between East 17th Street and East 14th Street (Southbound Lanes of Union Square West Only)
Dispersal:
  • East 14th Street between Union Square East and 5th Avenue
  • East 18th Street Broadway and Park Avenue South

Cinco De Mayo NYC Parade 2024

The following streets will be closed for the Cinco De Mayo NYC Parade 2024 Sunday May 5th, 2024 at the discretion of the NYPD in Manhattan.

Location(s):
Formation:
  • West 106th Street between Manhattan Avenue and Central Park West
Route:
  • Central Park West between West 106th Street and West 97th Street
Dispersal:
  • West 97th Street between Central Park West and Columbus Avenue

Manhattan/Queens

Ed Koch/Queensboro Bridge

Single-lane Queens-bound south upper roadway will be closed 24/7. Double-lane Queens-bound south upper roadway will be closed Monday to Friday from 9:30 am to 3 pm and from 8 pm to 5 am next morning, and Saturday from 5 am to 2 pm. During second lane closure, one Manhattan-bound upper roadway lane will reverse to service Queens-bound traffic. Queens-bound south outer roadway will be closed Sunday to Saturday from 1 am to 6 am. These closures are necessary to facilitate replacement of upper roadway.


Manhattan/Brooklyn

Manhattan Bridge

Single-lane at a time will be closed on upper and lower roadways Tuesday from 9 pm to 3 am next morning to facilitate maintenance. At least one lane of traffic in each direction will be maintained at all times.

Brooklyn Bridge

Pearl Street entrance ramp to eastbound (Brooklyn-bound) Brooklyn Bridge (Ramp B) will be closed Monday to Friday from 11 pm to 5 am next morning to facilitate bridge rehabilitation.

Williamsburg Bridge

Single-lane Brooklyn-bound south outer roadway will be closed from Saturday 5 am to Monday 5 am, and Monday to Friday from 5 am to 7 pm. Single-lane Brooklyn-bound south inner roadway will be closed Monday to Friday from 10 am to 3 pm. Single-lane Manhattan-bound north outer roadway will be closed Monday to Friday from 7 pm to 5 am and single-lane Manhattan-bound north inner roadway will be closed Monday to Friday from 8 pm to 5 am. These closures are necessary to facilitate Structural Strengthening and rehabilitation.


Manhattan/Bronx

Broadway Bridge over the Harlem River

Right lane in both directions will close Monday to Friday from 7 am to 3 pm and alternating center lane in either direction will close Monday to Friday from 10 am to 2 pm through May 10, 2024, to facilitate rope cable cleaning, machinery repairs, and electrical conduit installation. Alternating sidewalk closures will be in effect.

Washington Bridge over the Harlem River (181 Street)

Single-lane Manhattan-bound will be closed Monday to Friday from 12:01 am to 5 am through May 24, 2024, to facilitate installation of concrete barrier for the protected bike lane.


Bronx

East 153rd Street between Bergen Avenue and 3rd Avenue

This street will be closed from 9 am to 4 pm Friday through 5/10/24 for concrete pours and material deliveries.

West 169th Street between Nelson Avenue and Shakespeare Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 6/1/24 for use of knuckle boom and concrete pump operations.

East 176th Street between Belmont Avenue and Crotona Avenue

This street will be closed from 7 am to 4 pm Monday to Friday through 5/22/24 to facilitate crane operation.

East 180th Street between Ryer Avenue and Anthony Avenue

This street will be closed from 9 am to 2 pm Friday, and 8 am to 4 pm Saturday through 5/18/24 for concrete pouring and booming operations.

East 180th Street between Anthony Avenue and Ryer Avenue

This street will be closed from 9 am to 2 pm Friday, and 8 am to 4 pm Saturday through 6/3/24 to place crane to erect new building.

East 196th Street between Briggs Avenue and Bainbridge Avenue

This street will be closed from 4 pm to 11:59 pm Monday to Friday through 7/24/24 for tele handler for facade and roof work.

East 228th Street between Lowerre Place and White Plains Road

This street will be closed from 6 am to 4 pm Monday to Friday through 5/10/24 for mainline track repairs.

East 229th Street between Lowerre Place and White Plains Road

This street will be closed from 6 am to 4 pm Monday to Friday through 5/10/24 for mainline track repairs.

East 230th Street between Lowerre Place and White Plains Road

This street will be closed from 6 am to 4 pm Monday to Friday through 5/10/24 for mainline track repairs.

East 231st Street between Carpenter Avenue and White Plains Road

This street will be closed from 6 am to 4 pm Monday to Friday through 5/10/24 for mainline track repairs.

West 262nd Street between Huxley Avenue and Broadway

This street will be closed from 8 am to 5 pm Monday to Friday through 6/30/24 for use of concrete pumps, boom trucks and knuckle boom.

Continental Avenue between East 194th Street and Westchester Avenue/NYCTA Subway

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 4/30/24 to hoist and erect precast plank, precast stairs, structural steel and materials.

Gerard Avenue between East 150th Street and East 151st Street

This street will be closed from 9 am to 4 pm Monday to Friday, and 8 am to 4 pm Saturday through 6/2/24 for new building construction.

Belmont Avenue between East 176th Street and Dead End

This street will be closed from 9 am to 5 pm Monday to Friday, and Saturday from 8 am to 4 pm through 6/3/24 for new building construction.

Bush Street between Creston Avenue and Grand Concourse

This street will be closed from 8 am to 4 pm Monday to Friday through 5/17/24 to facilitate crane operation.

Creston Avenue between 196th Street and East Kingsbridge Road

This street will be closed from 9 am to 4 pm Friday through 7/24/24 to facilitate crane operation.

Weiher Court between Washington Avenue and 3rd Avenue

This street will be closed from 8 am to 4 pm Monday to Friday through 5/31/24 for use of crane to erect new building.

Andrews Avenue between Hall of Fame Terrace and West 183 Street

This street will be closed from 6 pm to 2 am Monday to Friday through 6/29/24 for boom truck for lifting materials to school building.

Andrews Avenue between West 176th Street

This street will be closed from 9 am to 2 pm Monday to Friday, Saturday from 8 am to 4 pm through 6/1/24 hoisting and pumping operations.

Whitlock Avenue between Aldus Street and East 165th Street

This street will be closed 8 am to 6 pm Saturday through 6/4/24 to facilitate crane operation.

Cruger Avenue between Sagamore Street and Bronxdale Avenue

This street will be closed from 8 am to 5 pm Friday through 6/28/24 for MTA contract C-35311 work zone and MP 6.

Villa Avenue between East 205th Street and Van Cortlandt Avenue East

This street will be closed from 8 am to 5 pm Monday to Friday through 5/12/24 for boom and knuckle boom to work on building.

Park Avenue between East 138th Street and East 135th Street

This street will be closed from 7 am to 6 pm Monday to Friday through 5/31/24 for all superstructure operations.

Sacket Avenue between Hone Avenue and Paulding Avenue

This street be closed from 9 am to 4 pm Friday through 5/10/24 for a drainage tie into an existing manhole in the street.

Shore Road Bridge over the Hutchinson River

Single-lane northbound will be closed Monday to Friday from 7 am to 9 am and single-lane in both directions will be closed from 9 am to 1 pm and 10 pm to 7 am next morning through May 10, 2024 to facilitate maintenance. One lane of traffic in each direction will be maintained at all times.

Anthony Avenue between East 176th Street and East 175th Street

This street will be closed from 9 am to 4 pm Friday through 5/10/24 to facilitate crane operation.

Mahan Avenue between Middletown Road and Roberts Avenue

This street will be closed from 9 am to 4 pm Friday to facilitate crane operation.

Hutchinson River Parkway Northbound between Exit 1B (East Tremont/Westchester Avenues) and Entrance ramp from Hutchinson River Parkway East

Single-lane northbound will close Monday to Thursday from 9 am to 3 pm and 10 pm to 5 am next morning, Friday from 10 am to 3 pm and 11 pm to 3 pm next day, and Saturday from 11 pm to 2 pm next day. Double-lane northbound will close Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate Westchester Avenue Bridge reconstruction and will continue through June 30, 2024.

Hutchinson River Parkway Southbound between Exit 1C (Pelham Parkway) and Entrance ramp from Westchester Avenue

Single-lane southbound will close Monday to Thursday from 10 am to 3 pm and 10 pm to 5 am next morning, Friday from 10 am to 3 pm and 10 pm to 6 am next morning, and Saturday from 10 pm to 2 pm next day. Double-lane southbound will close Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6:30 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate Westchester Avenue Bridge reconstruction and will continue through June 30, 2024.

Entrance Ramp from Southbound Sheridan Boulevard (NY-895) to Westbound Bruckner Expressway (I-278)

This ramp will be closed through December 24, 2024, to facilitate Hunts Point Interstate Access Improvement Project. Trucks and buses are advised to use the exit ramp towards Edgewater Road/Hunts Point Market and follow the detour signs and use the Leggett Avenue entrance ramp to westbound Bruckner Expressway. Cars are advised to use the temporary exit ramp towards Whitlock Avenue and follow the detour signs to westbound Bruckner Expressway.

Major Deegan Expressway (northbound) between Exit 3 and Entrance ramp north of East 138 Street

Right-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025 to facilitate East 138 Street Bridge replacement. Full closure may occur Monday to Friday between 12 am and 5 am for demolition and erection of the superstructure.

Major Deegan Expressway (southbound) between Exit 3 and Entrance ramp south of East 138 Street

Right-lane will become an exit only lane at Exit 3 24/7. Additional lane will be closed Monday to Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025 to facilitate East 138 Street Bridge replacement. Southbound exit ramp to 138 Street bridge will be closed Monday to Friday from 11 pm to 5 am, Friday from 11 pm to 6 am next morning, Saturday from 11 pm to 9 am next morning, and Sunday from 11 pm to 5 am next morning to facilitate water main connections.


Festivals, Parades and Events


Run The Bronx

The following streets will be closed for Run The Bronx on Saturday, May 4th, 2024 at the discretion of the NYPD in the Bronx.

Location(s):
Formation:
  • Hall of Fame Terrace between Sedgewick Avenue and University Avenue
Route:
  • West 181st Street between University Avenue and Aqueduct Avenue
  • Aqueduct Avenue between West 181st Street and West 184th Street
  • East 184th Street between West 184th Street and Grand Concourse
  • Grand Concourse between East 184th Street and East 179th Street
  • Grand Concourse between East 179th Street and Van Cortlandt Avenue East
Dispersal:
  • University Avenue between West 181st Street and West 180th Street

Brooklyn/Queens

Metropolitan Avenue Bridge over English Kills

Single-lane in either direction will be closed Monday to Friday from 11 pm to 5 am next morning, through May 3, 2024, to facilitate bridge maintenance. At least one lane in each direction will be maintained at all times.


Brooklyn

Brooklyn-Queens Expressway between Atlantic Avenue and Clark Street

Single-lane Queens-bound and the Atlantic Avenue entrance ramp to Queens-bound Brooklyn-Queens Expressway will be closed Monday to Friday from 12 am to 5 am through May 10, 2024, to facilitate core extraction and testing.

Brooklyn-Queens Expressway between Atlantic Avenue and Sands Street

Queens-bound will be closed from Saturday 2 am to Monday 4 am, to facilitate critical repairs of the triple cantilever structure. Queens-bound Brooklyn-Queens Expressway entrance ramps at Atlantic Avenue, 3 Avenue, Prospect Expressway, and Hamilton Avenue, will also be closed. Motorists may use the Tillary Street entrance ramp to access Queens-bound mainline. On Atlantic Avenue between Clinton Street and Boerum Place, south side parking lane will accommodate right and thru traffic while two eastbound lanes will be dedicated to left-turn traffic onto Boerum Place. On Canal Street between Chrystie and Allen Streets, westbound lanes will be closed.

Brooklyn-Queens Expressway between Vine Street Entrance Ramp and Atlantic Avenue

Single-lane Staten Island-bound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 1 am to 9 am, through May 3, 2024, to facilitate core extraction and testing.

7 Avenue Bridge over LIRR between 64 Street and 62 Street

Approximately 35 parking spaces will be eliminated, and travel lanes will be shifted to the parking lanes, Monday to Friday from 7 am to 6 pm, through May 17, 2024, to facilitate rehabilitation.

12th Street between 4th Avenue and 5th Avenue

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for hoisting and pumping operations.

18 Avenue Bridge over LIRR between 52 Street and 54 Street

Approximately 16 parking spaces will be eliminated, and travel lanes will be shifted to the parking lanes, Monday to Friday from 7 am to 6 pm, through May 17, 2024, to facilitate rehabilitation.

South 3rd Street between Bedford Avenue and Driggs Avenue

This street will be closed from 9 am to 4 pm Friday through 6/11/24 for booming and concrete operations.

South 9th Street between Berry Street and Bedford Avenue

This street will be closed from 9 am to 4 pm Friday through 6/4/24 for material booming and concrete pouring.

North 6th Street between Wythe Avenue and Berry Street

This street will be closed from 9 am to 4 pm Friday through 5/17/24 to facilitate crane operation.

North 6th Street between Berry Street and Bedford Avenue

This street will be closed from 9 am to 4 pm Friday through 5/17/24 for associated closure.

North 9th Street between Kent Avenue and Wythe Avenue

This street will be closed from 9 am to 4 pm Friday through 6/1/24 to facilitate crane operation.

East 9th Street between Kings Highway and Quentin Road

This street will be closed from 9 am to 4 pm Friday through 5/31/24 for use of concrete pump, knuckle boom for new building construction.

12th Street between 4th Avenue and 5th Avenue

This street will be closed from 9 am to 4 pm Friday through 5/30/24 for hoisting and pumping operations.

West 15th Street between Surf Avenue and Mermaid Avenue

This street will be closed from 9 am to 4 pm Friday through 5/31/24 for telescopic lift.

East 18th Street between Kings Highway and Quentin Road

This street will be closed from 9 am to 4 pm Friday through 6/1/24 for use of boom, knuckle boom and concrete pump to work on new building.

East 22nd Street between Beverly Road and Duryea Place

This street will be closed from 9 am to 4 pm Friday through 5/9/24 for concrete pump and knuckle boom use.

25th Street between 4th Avenue and 5th Avenue

This street will be closed from 9 am to 4 pm Friday through 5/8/24 to facilitate crane operation.

East 26th Street between Foster Avenue and Newkirk Avenue

This street will be closed from 9 am to 4 pm Friday through 5/7/24 for use of boom and knuckle boom to work on new building.

East 49th Street between Rutland Road and Winthrop Street

This street will be closed 9 am to 4 pm Friday through 5/31/24 to inspect sewer and repair collapsed roadway.

58th Street between 7th Avenue and 8th Avenue

This street will be closed from 9 am to 4 pm Friday through 5/3/24 to facilitate crane operation.

62nd Street between 13 Avenue and 14 Avenue

This street will be closed from 9 am to 4 pm Friday through 5/25/24 for boom, knuckle boom and concrete pump to work on our new building.

Bridgewater Court between Coney Island Avenue and Brighton 7th Street

This street will be closed from 9 am to 4 pm Friday through 5/3/24 to facilitate crane operation.

Carroll Street between 6th Avenue and 7th Avenue

This street will be closed from 8 am to 5 pm Saturday through 5/4/24 to facilitate crane operation.

Carroll Street between Bond Street and Body of Water

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for use of concrete pump and knuckle boom truck.

Chapel Street between Jay Street and Flatbush Avenue Exit

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for use of concrete pump and knuckle boom truck.

Duryea Place between Flatbush Avenue and East 22nd Street

This street will be closed from 9 am to 4 pm Friday through 5/15/24 for concrete pump and knuckle boom use.

Bouck Court between Shell Road and West 3rd Street

This street will be closed from 10 pm Friday to 8 pm Sunday through 5/12/24 to facilitate crane operation.

Shell Road between Avenue Y and Bouck Court

This street will be closed from 10 pm Friday to 8 pm Sunday through 5/12/24 to facilitate crane operation.

Shell Road between Bouck Court and Avenue X

This street will be closed from 10 pm Friday to 8 pm Sunday through 5/12/24 to facilitate crane operation.

Battery Avenue between 86 Street and 88 Street

This street will be closed from 9 am to 4 pm Friday through 5/3/24 to lift on roadway for window caulking.

Webster Place between East 16 Street and Prospect Avenue

This street will be closed from 9 am to 4 pm Friday through 5/19/24 to build conduit to 5 Webster Place.

New Jersey Avenue between Jamaica Avenue and Fulton Street

This street will be closed from 9 am to 4 pm through 6/30/24 for use of boom truck and concrete boom.

Vermont Street between Jamaica Avenue and Fulton Street

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for use of boom truck and concrete boom.

Douglass Street between 4th Avenue and 3rd Avenue

This street will be closed from 9 am to 4 pm Friday through 7/11/24 to facilitate crane operation.

Eckford Street between Driggs Avenue and Engert Avenue

This street will be closed from 9 am to 4 pm Friday through 5/6/24 for use of boom, knuckle boom and concrete pump to work on new building.

Lott Street between Tilden Avenue and Beverly Road

This street will be closed from 9 am to 4 pm Friday through 5/31/24 for concrete pump and knuckle boom.

Hancock Street between Ralph Avenue and Howard Avenue

This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 5/16/24 to facilitate crane operation.

Gallatin Place between Livingston Street and Fulton Street

This street will be closed from 9 am to 4 pm Friday through 7/27/24 for new building.

Hudson Avenue between Dekalb Avenue and Fulton Street

This street will be close from 9 am to 4 pm Friday through 5/29/24 for use of knuckle boom/concrete pump.

Lawrence Street between Fulton Street and Willoughby Street

This street will be closed from 9 am to 4 pm Friday through 7/27/24 for boom, knuckle boom and concrete pump to work on new building.

Sandford Street between Myrtle Avenue and Park Avenue

This street will be closed from 9 am to 4 pm Friday through 5/10/24 for new building construction, concrete pouring operations.

Linden Street between Wilson Avenue and Knickerbocker Avenue

This street will be closed from 7 am to 4 pm Monday to Friday through 5/24/24 to facilitate crane operation.

Debevoise Avenue between Maspeth Avenue and Jackson Street

This street will be closed from 9 am to 4 pm Friday through 6/5/24 to hoist and erect structural steel and building materials.

St. Felix Street between Dekalb Avenue and Fulton Avenue

This street will be closed from 9 am to 4 pm Weekdays through 5/6/24 for emergency front building facade work with boom lift.

Van Sinderen Avenue between Herkimer Street and Fulton Street

This street will be closed from 7 am to 6 pm Saturday through 6/17/24 for major service.

Clinton Street between Pierrepont Street and Cadman Plaza West

This street will be closed from 9 am to 4 pm Friday through 7/16/24 to facilitate crane operation.

Sanford Street between Myrtle Avenue and Park Avenue

This street will be closed from 9 am to 4 pm Friday through 7/4/24 to facilitate crane operation.

Grand Avenue between Fulton Street and Lefferts Place

This street will be closed from 9 am to 4 pm Friday through 7/8/24 for gas main installation.

Grand Avenue between Fulton Street and Putnam Avenue

This street will be closed from 9 am to 4 pm Friday through 7/8/24 for gas main installation.

Grand Avenue between Pacific Street and Dean Street

This street will be closed from 9 am to 2 pm Monday to Friday through 5/28/24 for use of boom, knuckle boom and concrete pump to work on new building.

Dean Street between Franklin Avenue and Classon Avenue

This street will be closed from 9 am to 4 pm Friday through 6/7/24 for use of boom, knuckle boom and concrete pump to work on new building.

Eldert Street between Knickerbocker Avenue and Irving Avenue

This street will be closed from 9 am to 4 pm Friday through 5/31/24 for use of man lift to remove building facade.

Hart Street between Broadway and Stuyvesant Street

This street will be closed from 9 am to 4 pm Friday through 6/30/24 for concrete pump usage.

Herkimer Street between Havens Place and Van Sinderen Avenue

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service to 2440 Fulton Street.

Herkimer Street between Havens Place and Intersection

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service.

Herkimer Street between Havens Place and Jardine Place

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service.

Havens Place between Herkimer Street and Atlantic Avenue

This street will be closed from 9 am to 4 pm Friday through 6/17/24 for major service.

India Street between Body of water (Dead End) and West Street

This street will be closed from 7 am to 6 pm Monday to Friday through 5/31/24 for large concrete pours.

Richardson Street between Lorimer Street and Union Avenue

This street will be closed from 9 am to 4 pm Friday through 7/8/24 to facilitate crane operation.

Prospect Place between Buffalo Avenue and Ralph Avenue

This street will be closed from 9 am to 4 pm Monday to Friday through 5/11/24 to facilitate crane operation.


Festivals, Parades and Events


Cinco De Mayo & Mother’s Day Parade

The following streets will be closed for the Cinco De Mayo & Mother’s Day Parade on Sunday, May 5th, 2024 at the discretion of the NYPD in Brooklyn.

Location(s):
Formation:
  • 59th Street between 4th Avenue and 6th Avenue
  • 5th Avenue between 59th Street and 60th Street
Route:
  • 5th Avenue between 59th Street and 43rd Street
Dispersal:
  • 5th Avenue between 43rd Street and 41st Street

Queens

Francis Lewis Boulevard Bridge over Belt System Laurelton Parkway

Single-lane in both directions on the Belt System Lauralton Parkway underpass will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane will be closed from 1 am to 5 am through May 22, 2024. One lane in each direction will be maintained. These closures are necessary to facilitate bridge underdeck rehabilitation.

Belt Parkway/Laurelton Parkway

Shoulder and adjacent lane in both directions will be closed Monday to Friday from 10 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.

Belt Parkway between Exit 21B and Exit 20

Single-lane westbound will be closed Monday to Thursday from 10 am to 2 pm and 10 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.

Clearview Expressway between Throgs Neck Bridge and 500 feet south of Grand Central Parkway

Shoulder and adjacent lane in both directions will be closed Monday to Friday from 9 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.

Cross Island Parkway (entire length)

Shoulder and adjacent lane in both directions will be closed Monday to Friday from 10 am to 3 pm, through November 1, 2024, to facilitate electrical repairs.

Grand Central Parkway between RFK Bridge and Nassau County Line

Shoulder and adjacent lane will be closed Monday to Friday from 10 am to 2 pm on the eastbound and from 10 am to 3 pm on the westbound, through November 1, 2024, to facilitate electrical repairs.

Grand Central Parkway between Long Island Expressway and 62 Drive Pedestrian Bridge over Grand Central Parkway

Single-lane in both directions will be closed Monday to Friday from 10 pm to 5 am next morning and double-lane will be closed from 12:01 am to 5 am. Lane reduction from 18 feet to 11 feet wide will occur Monday to Friday from 10 pm to 5 am next morning on the eastbound Collector Distributor Road ramp from eastbound Grand Central Parkway to eastbound Long Islang Expressway. Lane reduction from 15 feet to 10 feet wide will occur Monday to Friday from 12:01 am to 5 am on the ramp from eastbound Grand Central Parkway to eastbound Long Island Expressway. These closures are necessary to facilitate flood mitigations and will continue through June 30, 2024.

Grand Central Parkway between 47 Street and Hazen Street

Single-lane in both directions will be closed Monday to Friday from 10 pm to 5 am next morning through June 30, 2024 to facilitate flood mitigation.

Van Wyck Expressway Viaduct Rehabilitation

Single-lane in both directions will be closed Monday to Thursday from 10 pm to 5 am next morning, Saturday and Sunday from 1 am to 6 am. Double-lane in both directions will be closed Monday to Friday from 1 am to 5 am, Saturday and Sunday from 2 am to 6 am. These closures are necessary to facilitate bridge rehabilitation and will continue through September 30, 2024.

Van Wyck Expressway

Single-lane in both directions will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 10 pm to 6 am, Friday from 11:59 pm to 8 am, Saturday from 11 pm to 10 am, and Sunday from 10 pm to 6 am. Double-lane in both directions will be closed Monday to Thursday from 11 pm to 4 am and Sunday from 1 am to 7 am. Double-lane will be closed Friday from 11 pm to 7 am for northbound and from 11 pm to 5 am for southbound. The exit and entrance ramps along the north and southbound of the expressway may also be closed. These closures are necessary to facilitate roadway widening and will continue through July 14, 2025.

Van Wyck Expressway between Northern Boulevard and Long Island Expressway

Double-lane in either direction will be closed Monday and Friday from 12:01 am to 5 am, Tuesday to Thursday from 11 pm to 5 am next morning, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 9 am for southbound and 12:01 am to 7:30 am for northbound. These closures are necessary to facilitate reconstruction of Roosevelt Avenue Bridge and will continue through May 10, 2024.

Van Wyck Expressway between Long Island Expressway and Pedestrian Bridge over Van Wyck Expressway

Single-lane in both directions will be closed Monday to Friday from 11 pm to 5 am. Double-lane will be closed Monday to Friday from 12:01 am to 6 am for southbound and from 12:01 am to 5:30 am for northbound. These closures are necessary to facilitate flood mitigations and will continue through June 30, 2024.

Van Wyck Expressway in the vicinity of Roosevelt Avenue Bridge

Single-lane northbound will be closed Monday to Friday from 9:30 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 9 pm to Saturday 12 pm, and Saturday 8 pm to Sunday 12 pm. Single-lane southbound will be closed Monday to Friday from 9:30 am to 2 pm, Monday to Thursday from 10 pm to 5 am next morning, Friday from 9 pm to Saturday 3 pm, and Saturday 8 pm to Sunday 3 pm. Double-lane northbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 7:30 am. Double-lane southbound will be closed Monday to Friday from 12:01 am to 6 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 9 am. At least one lane of traffic in each direction will be maintained at all times. These closures are necessary to facilitate reconstruction of Roosevelt Avenue Bridge and will continue through July 2, 2024.

Long Island Expressway between Clearview Expressway and Springfield Boulevard

Single-lane eastbound mainline will be closed Monday to Friday from 10 am to 2 pm, Monday to Thursday from 11 pm to 5 am next morning, Friday from 11 pm to 7 am next morning, and Saturday from 11 pm to 11 am next morning. Double-lane eastbound mainline will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 2 am to 9 am. Single-lane westbound mainline will be closed Monday to Friday from 10 am to 3 pm, Monday to Thursday from 11 pm to 5 am next morning, Friday from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound mainline will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. Mainline closures will continue through September 30, 2024. Single-lane of service road (Horace Harding Expressway) westbound will be closed Monday to Friday from 10 am to 3 pm, Monday to Thursday from 11 pm to 5 am next morning, Friday from 11 pm to Saturday 3 pm, and Saturday from 11 pm to 9 am next morning. Service road closures will continue through December 31, 2024. These closures are to facilitate replacement of Oceania Street Bridge.

Long Island Expressway between Van Wyck Expressway and Grand Central Parkway

Single-lane westbound on the mainline and service road will be closed Monday to Friday from 10 pm to 5 am next morning. Single-lane eastbound will be closed Monday to Friday from 11 pm to 6 am next morning. Ramp from eastbound service road to eastbound Grand Central Parkway will be closed Monday to Friday from 12:01 am to 5 am and motorists are advised to detour to next entrance ramp by 72 Road. These closures are necessary to facilitate flood mitigations and will continue through June 30, 2024.

Long Island Expressway between Queens Midtown Tunnel and Nassau County Line

Shoulder and adjacent lane will be closed Monday to Friday from 10 am to 2 pm on the eastbound and from 10 am to 3 pm on the westbound, through November 1, 2024, to facilitate electrical repairs.

Long Island Expressway between Queens Midtown Tunnel and Maurice Avenue

Single-lane eastbound will be closed Monday to Friday from 10 am to 2 pm and from 11 pm to 6 am next morning, Saturday from 12:01 am to 10 am, and Sunday from 12:01 am to 11 am and from 10 pm to 6 am next morning. Double-lane eastbound will be closed Monday to Friday from 1 am to 6 am, Saturday from 2 am to 8 am, and Sunday from 2 am to 8 am. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 10 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 7 am next morning, Saturday from 10 pm to 10 am next morning, and Sunday from 10 pm to 5 am next morning. Double-lane westbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 7 am. Intermittent 15-minute full closure in one direction at a time may occur Monday to Saturday between 2 am and 5 am except holidays and embargo days for maximum of five nights. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. These closures are necessary to facilitate installation of ATDM and ITS equipment and will continue through September 27, 2024.

Long Island Expressway between Maurice Avenue and College Point Boulevard

Single-lane eastbound will be closed Monday to Friday from 10 am to 2 pm and from 11 pm to 6 am next morning, Saturday from 12:01 am to 7 am, and Sunday from 12:01 am to 9 am. Double-lane eastbound will be closed Monday to Friday from 1 am to 6 am, Saturday from 2 am to 7 am, and Sunday from 2 am to 7 am. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 10 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 6 am next morning, and Saturday from 11 pm to 6 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 6 am. Intermittent 15-minute full closure in one direction at a time may occur Monday to Saturday between 2 am and 5 am except holidays and embargo days for maximum of five nights. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. These closures are necessary to facilitate installation of ATDM and ITS equipment and will continue through September 27, 2024.

Long Island Expressway between College Point Boulevard and City Line

Single-lane eastbound will be closed Monday to Thursday from 10 am to 2 pm and from 11 pm to 5 am next morning, Friday from 10 am to 2 pm and from 11 pm to 7 am next morning. Saturday from 11 pm to 11 am next morning. Double-lane eastbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 7 am, and Sunday from 2 am to 9 am. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 11 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. Double-lane westbound will be closed Monday to Friday from 1 am to 5 am, Saturday from 1 am to 6 am, and Sunday from 2 am to 9 am. Intermittent 15-minute full closure in one direction at a time may occur Monday to Saturday between 2 am and 5 am except holidays and embargo days for maximum of five nights. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. These closures are necessary to facilitate installation of ATDM and ITS equipment and will continue through September 27, 2024.

Nassau Expressway between Cross Bay Boulevard Entrance Ramp and Exit 2N

Single-lane eastbound will be closed Monday to Thursday from 10 am to 3 pm and 9 pm to 5 am next morning, Friday from 10 pm to 7 am next morning, and Saturday from 10 pm to 7 am next morning. Double-lane eastbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 7 am, and Sunday from 12:01 am to 7 am. Eastbound Exit Ramp 2S will be closed Monday to Thursday from 11 pm to 7 am next morning, Friday from 11 pm to 7 am next morning, and Saturday from 11 pm to 7 am next morning. These closures are necessary to facilitate JFK Redevelopment Program and will continue through December 31, 2025.

12 Street between Broadway and 31 Avenue

This street will be closed from 9 am to 4 pm Friday, and 8 am to 4 pm Saturday through 6/19/24 for 36” gas transmission main installation.

12 Street between 33 Avenue and Broadway

This street will be closed from 9 am to 4 pm Friday, and 8 am to 4 pm Saturday through 6/19/24 for 36” gas transmission main installation.

27th Street between 41st Avenue and Queens Plaza North

This street will be closed from 9 am to 4 pm Friday through 5/4/24 for installation of water service.

30th Street between 30th Avenue and Newtown Avenue

This street will be closed from 8 am to pm Saturday, and 9 am to 6 pm Sunday through 5/10/24 to facilitate crane operation.

37th Avenue between College Point Boulevard and Bud Place

This street will be closed from 9 am to 4 pm Friday, and 8 am to 4 pm Saturday through 5/8/24 to facilitate crane operation.

44 Street between 34 Avenue and 35 Avenue

This street will be closed from 9 am to 4 pm Friday through 6/28/24 for concrete pouring.

45 Street between 34 Avenue and Northern Boulevard

This street will be closed from 9 am to 4 pm Friday through 6/28//24 for concrete pouring.

49th Street between 50th Avenue and 48th Avenue

This street will be closed 24/7 through 6/23/24 to facilitate crane operation.

49th Avenue between Center Boulevard and 5th Street

This street will be closed from 7:30 am to 9 pm Saturday and Sunday through 5/5/24 to facilitate crane operation.

66th Avenue between Queens Boulevard and 99th Street

This street will be closed from 9 am to 4 pm Friday, and 8 am to 4 pm Saturday through 5/12/24 for new building construction, concrete pouring operations.

Penrod Street between 108th Street and Horace Harding Expressway

This street will be closed from 8 am to 4 pm Saturday through 6/30/24 for DEP contract PS-277 108th Street pump station reconstruction.


Staten Island

Tompkins Avenue Bridge over Greenfield Avenue

Single-lane and parking on the east side of the bridge will be closed Monday to Friday from 7 am to 3:30 pm through May 17, 2024, to facilitate bridge rehabilitation. Two-way traffic will be maintained at all times.

Iona Street between Father Capodanno Boulevard and Quincy Avenue

This street will be closed from 7 am to 6 pm Monday to Friday through 6/12/24 for full roadway closure.


Citywide


Festivals, Parades and Events


Five Boro Bike Tour

The following streets will be closed for the Five Borough Bike Tour on Sunday May 5th, 2024 at the discretion of the NYPD in Manhattan /Bronx/Queens/Brooklyn/Staten Island.

Embargo:

  • Special Event Construction Embargo / April 26th, – May 5th, 2024 (Ten Day Embargo)
  • Special Event Construction Embargo / May 1st – May 5th, 2024 (Five Day Embargo)
  • Special Event Construction Embargo / May 3rd – May 5th, 2024 (Three Day Embargo)

Location(s):

Ten Day Embargo locations

Manhattan Portion:

  • Greenwich Street between Battery Place and Morris Street
  • Trinity Place between Morris Street and Liberty Street
  • Church Street between Liberty Street and Canal Street
  • Chambers Street between Broadway and West Broadway
  • Worth Street between Broadway and West Broadway
  • Canal Street between Broadway and 6th Avenue
  • 6th Avenue between Franklin Street and West 59th Street
  • West 59th Street between 6th Avenue and 5th Avenue
  • Grand Army Plaza between West 59th Street and East Drive
  • East Drive between Grand Army Plaza and Center Drive
  • Center Drive between 5th Avenue and East Drive
  • East Drive between Center Drive and Adam Clayton Powell Jr. Boulevard
  • Adam Clayton Powell Jr. Boulevard between West 110th Street and West 135th Street
  • East / West 135th Street between Adam Clayton Powell Jr. Boulevard and Madison Avenue
  • Madison Avenue between East 135th Street and East 138th Street
  • Madison Avenue Bridge (Bronx-bound)

Bronx Portion:

  • 138th Street between Madison Avenue Bridge and 3rd Avenue
  • 3rd Avenue between 138th Street and 3rd Avenue Bridge
  • Rider Avenue between 138th Street and 137th Street
  • 137th Street between Rider Avenue and 3rd Avenue
  • 3rd Avenue Bridge (Manhattan-bound)

Manhattan Portion (Continued):

  • Harlem River Drive / FDR Drive (Southbound) between 3rd Avenue Bridge and East 116th Street
  • East 116th Street between FDR Drive and Pleasant Avenue
  • Pleasant Avenue between East 116th Street and East 114th Street
  • Harlem River Drive / FDR Drive (Southbound) between 116th Street and 63rd Street Exit
  • East 63rd Street between FDR Drive (Southbound) and Queensboro Bridge Exit
  • Queensboro Bridge Exit between East 63rd Street and East 60th Street
  • Queensboro Bridge Upper Level (Manhattan-bound)

Queens Portion:

  • 21st Street between Queens Plaza South and Hoyt Avenue North
  • Queens Plaza South between 21st Street and Vernon Boulevard / Alternate Route
  • Hoyt Avenue North between 21st Street and 19th Street
  • 19th Street between Hoyt Avenue North and Ditmars Boulevard
  • Ditmars Boulevard between 19th Street and Shore Boulevard
  • Shore Boulevard between Ditmars Boulevard and Astoria Park South
  • Astoria Park South between Shore Boulevard and 14th Street
  • 14th Street between Astoria Park South and 31st Avenue
  • 31st Avenue between 14th Street and Vernon Boulevard
  • Vernon Boulevard between 31st Avenue and 44th Drive
  • 44th Drive between Vernon Boulevard and 11th Street
  • 11th Street between 44th Drive and Pulaski Bridge
  • Pulaski Bridge (Brooklyn-bound)

Brooklyn Portion:

  • McGuiness Boulevard between Pulaski Bridge and Greenpoint Avenue
  • Java Street between McGuinness Boulevard and Franklin Street
  • Greenpoint Avenue between McGuinness Boulevard and Franklin Street
  • Franklin Street between Java Street and North 14th Street
  • Kent Avenue between North 14th Street and Williamsburg Street West
  • Williamsburg Street West between Kent Avenue and Flushing Avenue
  • Flushing Avenue between Williamsburg Street West and Navy Street
  • North Elliot Place between Flushing Avenue and Park Avenue
  • Navy Street between Flushing Avenue and York Street
  • York Street between Navy Street and Gold Street
  • Gold Street between York Street and Front Street
  • Front Street between Gold Street and Old Fulton Street
  • Old Fulton between Furman Street and Prospect Street
  • Cadman Plaza West between Prospect Street and Tillary Street
  • Tillary Street between Cadman Plaza West and Adams Street
  • Brooklyn Bridge Promenade between Tillary Street and Centre Street
  • Furman Street between Old Fulton Street and Atlantic Avenue
  • Atlantic Avenue between Furman Street and Columbia Street
  • Columbia Street between Atlantic Avenue and BQE West Entrance Columbia Street
  • BQE / Gowanus Expressway between BQE West Entrance Columbia Street and Verrazano
  • Verrazano Bridge Lower Level (Staten Island-bound)

Staten Island Portion:

  • Bay Street between New York Avenue and Hylan Boulevard
  • Hylan Boulevard between Bay Street and Edgewater Street
  • Edgewater Street/ Front Street between Hylan Boulevard and Hannah Street
  • Hannah Street between Front Street and Bay Street
  • Bay Street between Hannah Street and Richmond Terrace
  • Richmond Terrace between Bay Street and Nicholas Street Wall Street between Richmond Terrace and Dead End

Five Day Embargo locations

Manhattan Portion:

  • Peter Minuit Plaza between State Street and South Street
  • Whitehall Street between South Street and Water Street
  • State Street between Whitehall Street and Battery Place
  • Battery Place between State Street and West Street
  • Morris Street between Broadway and Greenwich Street
  • Albany Street between West Street and Greenwich Street
  • Greenwich Street between Rector Street and Cedar Street
  • West Broadway between Vesey Street and Barclay Street
  • West Broadway between Murray Street and Warren Street
  • Rector Street between Broadway and Greenwich Street
  • Cedar Street between Broadway and Greenwich Street
  • Liberty Street between Broadway and Greenwich Street
  • Dey Street between Broadway and Church Street
  • Vesey Street between West Street and West Broadway
  • Murray Street between Broadway and West Broadway
  • Warren Street between West Street and Broadway
  • Duane Street between Broadway and West Broadway
  • Thomas Street between Broadway and West Broadway
  • Leonard Street between Broadway and West Broadway
  • Franklin Street between Broadway and West Broadway
  • White Street between Broadway and West Broadway
  • Walker Street between Broadway and 6th Avenue
  • Lispenard Street between Broadway and 6th Avenue

Three Day Embargo locations

Manhattan Portion:
  • Broad Street between Pearl Street and South Street
  • Broadway between Morris Street and Battery Place
  • South Street between Broad Street and Whitehall Street
  • Whitehall Street between South Street and Water Street
  • Water Street between Whitehall Street and Broad Street

 

Information about scheduled maintenance and construction on MTA Bridges and Tunnels.